Outokumpu Stainless Pipe, located in Wildwood, Florida is an 11,000 square foot manufacturing plant that was planning an expansion to house two new presses capable of exerting 3 million pounds of hydraulic pressure. CCA designed the foundation system appropriate for a sink-hole prone region to successfully support these large capacity presses. Consideration of the surrounding environment was critical to ensure that the construction would not disturb the surrounding soils and water.