<img alt="" src="https://secure.norm0care.com/146994.png" style="display:none;">

SUMMARY:

Burlington Ice Palace, located in Burlington, Massachusetts, was in need of an upgrade to their existing refrigeration system of the ice arena.  CCA was hired to conduct a site inspection, evaluate the existing structure, and design the new structural framing for accommodate the new rooftop mounted chiller systems.