<img alt="" src="https://secure.norm0care.com/146994.png" style="display:none;">

SUMMARY:

Laconia indoor skating rink in New Hampshire was forced to close due to a failure of the refrigeration system, necessary for the production and maintenance of the ice skating surface. CCA was hired by the insurance company and determined the correct cause of the failure to be the chiller unit and brine system and not the refrigeration system.